You don't have javascript enabled. Good luck with that.
Pencarian
Unit Pompa, Genangan, Jalan RE Martadinata

Four Pumps Deployed to Handle Inundation Around JIS

There were four pumps were deployed to handle inundation around Jakarta International Stadium (JIS), Jalan RE Martadinata, Papanggo Urban Village, Tanjung Priok, Tuesday (1/14).

Now the inundation recedes fully

North Jakarta Water Resources Sub-agency Head, Ahmad Syaiful explained his side deployed one pump with capacity of 150 liter per second and two floating pumps with each capacity of 50 liter per second.

C. Jakarta SDA Ensures 108 Pumps Functioned Well

Then the Ciliwung and Cisadane River Center (BBSWCC) also deployed one mobile pump.

"We have deployed three pumps since morning. Then another one pump was also deployed from BBSWCC," he explained, Tuesday (1/14).

He said that the 10 cm inundation around the JIS area was triggered by tidal wave and heavy rain that poured since morning until noon.

"We pumped the water from the road to longstorage of Ancol near the location," he said.

The inundation around JIS area started to recede at noon and then fully receded in the afternoon.

"Now the inundation recedes fully and traffic flow runs smoothly," he stated.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1041 personFolmer
  2. Posyandu-Posbindu Services Reach 1,600 Seniors and Toddlers in Utan Panjang

    access_time07-04-2026 remove_red_eye837 personFolmer
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye814 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye789 personTiyo Surya Sakti
  5. Palmeriam Market Adopts QRIS Digital Payment System

    access_time08-04-2026 remove_red_eye690 personNurito